Optima Building featuring Blade #1 horizontal aluminum louver system
Flagship Product

Blade #1 Horizontal Aluminum Louver System

The industry's premier hurricane-zone certified horizontal aluminum louver. PE-sealed engineering, TAS-tested performance, and precision Miami fabrication.

H.V.H.Z. APPROVEDPE-SEALEDTAS 201/202/203FBC 2023

Technical Specifications

SpecificationValue
Product NameBlade #1 Horizontal Aluminum Louver System
Product CategoryStructural Components
Material5052-H32 Aluminum Alloy
Maximum Panel Height8'-3 7/16"
Maximum Panel Width2'-0"
Wind Load StandardASCE 7-22
Substrate CompatibilityPoured concrete, grouted concrete block, wood frame, steel, aluminum
Hurricane ZoneApproved for H.V.H.Z. (Section 202, Florida Building Code)
Product Evaluation ReportNo. 25-1204.01 (Tilteco, Inc.)
PE LicenseFL P.E. #44167 — Walter A. Tillit, Jr.
Drawing Number24-122
Report DateDecember 4, 2025

Certifications & Testing Protocols

TAS 201 — Large Missile Impact Resistance

Tested for large missile impact under sections 1626 and 1609.1.2 of the Florida Building Code. 9 lb, 2"x4", at 50 ft/sec.

TAS 202 — Cyclic Wind Pressure Loading

Verified under cyclic loading protocols per AMCA 540 to simulate repeated hurricane-force wind pressure cycles.

TAS 203 — Uniform Static Air Pressure

Tested for uniform static load resistance in accordance with Florida Building Code sections 1616 and 1604.

Engineering Documents

Product Evaluation Report No. 25-1204.01

PE-sealed evaluation report by Tilteco, Inc. (FL P.E. #44167). Issued December 4, 2025.

Download PDF

Drawing No. 24-122

7-sheet PE-sealed installation drawing set. Includes anchor spacing, panel dimensions, and substrate details.

Download PDF

Installation Requirements

Substrate

Must be installed into poured concrete, grouted concrete block, wood frame, or steel/aluminum substrates per General Note 5, Drawing 24-122.

Anchor Spacing

Maximum anchor spacing as indicated on Sheet 7 of Product Evaluation Document, Drawing No. 24-122.

Compliance

Installation must strictly follow Sheets 3, 4, and 6 of Drawing No. 24-122. Non-compliant installation voids certification.